Electrolytic Tinning Line No. 3 (ETL 3) at project cost of P 9.2 Million, DISC constructed the building foundation including floor slabs and all structural built-up, fabricated and erected 223 metric tons of steel, sandblasted and painted the mechanical structures using special epoxy paint. This project was completed in July 1990.